City of Kingston – Dislodged decking realignment
City of Kingston - Dislodged decking realignment Additional structural reinforcement was installed using galvanised steel angle brackets on all beams bolted from both sides. Deck interface reinstated
Read moreCity of Kingston – Boardwalk Replacement
City of Kingston – Boardwalk Replacement Original split girder assessed on site. Girder was replaced in full to ensure structural integrity with Hard Wood – life expectancy 25-30 years (exceeding original scope) and then deck was replaced using timber planks like for like.
Read moreCity of Kingston – Crack Injection
City of Kingston – Crack Injection Crack in column treated using structural epoxy injection Epoxy putty (Fosroc Nitomortar AP) was applied around the column, waiting 24 hours for the curing time before the Low viscosity Epoxy injection (Fosroc Nitofill LV) to ensure containment and proper bonding
Read moreCity of Kingston – Boardwalk Timber Deck Structural Rectification work
City of Kingston – Boardwalk Timber Deck Structural Rectification work The works were carried out in accordance with the approved scope for timber deck structural rectification, including joist repairs and associated reinstatement works. During the course of the works, further deterioration was identified within the affected section of the structure.
Read moreCity of Kingston – Timber Maintenance Works
City of Kingston – Timber Maintenance Works Timber Maintenance & Structural Repairs - STRUCTURE: VB-0023 Works Undertaken: Open Girders/Stringers Access gained by removing decking as required Split girder was mechanically reinforced using a structural hardwood splice (Life expectancy 25-30 years) bolted from up and side. Boards on the deck were
Read moreCity of Kingston – Hand Rail replacement
City of Kingston - Hand Rail replacement Handrail replacement works at Structure ST0050, Bonbeach Beach. The original defect identified was corrosion of the handrail newel posts. Works undertaken: Removal of the deteriorated handrail section. Installation of a new like-for-like galvanised handrail assembly. Secure connection to sound existing buried steel substrate.
Read moreCity of Kingston – Erosion stabilisation – Emergency Works
City of Kingston – Erosion stabilisation – Emergency Works Completion of emergency erosion stabilisation works undertaken at the Mentone Foreshore shared path. The works were carried out in response to coastal scour and loss of supporting material beneath the concrete pathway, which had resulted in significant undermining of the slab
Read moreCity of Kingston – Boardwalk decking replacement
City of Kingston - Boardwalk decking replacement Decking Board Replacement and Structural Support Upgrade works undertaken following the inspection of deteriorated and cracked decking boards. Works Undertaken: Removal of seven (7) deteriorated decking boards. Removal of associated fixings and accessories. Cleaning and preparation of exposed structural elements. Disposal of removed
Read moreCity of Kingston – Masonry wall repair
Rectification works at Structure VB0008. Works Undertaken: The repair methodology was refined on-site to minimise demolition while improving structural performance. Removal of deteriorated mortar joints along the cracked/separated section Localised removal of two stones only where required to access internal defects Cleaning and preparation of existing stones and joint interfaces
Read moreCity of Kingston – Composite Decking replacement
City of Kingston – Composite Decking replacement Public Beach Shower Area – Composite Decking Replacement & Structural Support Upgrade. Works Undertaken: Sand Removal & Site Preparation Removed substantial quantities of accumulated sand from beneath the deck structure. Cleared trapped debris and moisture-retaining material. Improved ventilation and drainage beneath the deck