dustra
  • Home
  • About Us
  • Accreditations
  • Our Services
  • Projects
    • Inspection Projects
    • Asset Management
    • Bridge Maintenance
    • Project Practical Completion
  • Client Reviews
  • Contact Us
  • April 10, 2025
  • bieng

Frankston City Council Level 2 Structure inspections, Calculation of replacement costs and useful life, April 2025

Frankston City Council Level 2 Structure inspections, Calculation of replacement costs and useful life, April 2025 Bridge Inspection Engineers (BIE) are presently conducting Level 2 inspections for Frankston City Council 140 structures, which encompassed a condition assessment of Bridges, Culverts, Boardwalks, Retaining walls, Stairs, and Viewing Platform. This important project

Read more
  • April 10, 2025
  • bieng

Baw Baw Shire Council Level 2 inspections, Calculation of replacement costs and useful life, February to April 2025

Baw Baw Shire Council Level 2 inspections, Calculation of replacement costs and useful life, February to April 2025 Bridge Inspection Engineers (BIE) successfully completed Level 2 Inspections for Baw Baw Shire Council 218 structures, which encompassed a condition assessment of bridges and culvert. This important project represents a key achievement

Read more
  • April 10, 2025
  • bieng

Kingston City Council Structure Level 2 inspections, Calculation of replacement costs and useful life, March 2025

Kingston City Council Structure Level 2 inspections, Calculation of replacement costs and useful life, March 2025 Bridge Inspection Engineers (BIE) successfully completed Level 2 Inspections of Kingston City Council 115 structures, which encompassed a condition assessment of boardwalks, Stairs, Ramps, Viewing Platform. This important project represents a key achievement in

Read more
  • April 10, 2025
  • bieng

Brimbank City Council Structure Level 2 inspections, Calculation of replacement costs and useful life, December 2024 to March 2025

Brimbank City Council Structure Level 2 inspections, Calculation of replacement costs and useful life, December 2024 to March 2025 Bridge Inspection Engineers (BIE) successfully completed Level 2 Inspections of the Brimbank City Council, which encompassed a condition assessment of 82 structures, including bridges, Culverts, boardwalks and Viewing Platforms. This critical

Read more
  • December 28, 2024
  • bieng

Structures Level 1 Inspections of 1034 Structures VRMC Service Stream 2024

About the project: Our company demonstrated its capability to manage large-scale infrastructure projects with the successful completion of Level 1 inspections for the Department of Transport and Planning (DTP). This project involved inspecting approximately 1,000 road structures, including bridges, culverts, gantry signs, Retaining walls, High masts and noise walls, across

Read more
  • December 28, 2024
  • bieng

Bridge Level 2 Inspection Project in Hume City Council, Victoria

About the project: Every year, we conduct detailed Level 2  inspections of Bridges and Culverts for Hume City Council in partnership with LEKT across the Broadmeadows, Westmeadows, and Sunbury areas. This long-term collaboration reflects our commitment to delivering consistent, high-quality inspection services tailored to the council's needs. Our work involves

Read more
  • December 28, 2024
  • bieng

Bridge Level 2 Inspection Project in Buloke Shire Council Victoria

About the project: This project involved conducting Level 2 inspections on approximately 30 bridges in the Charlton area for Buloke Shire Council in partnership with LEKT. The inspections focused on assessing the structural integrity and safety of critical bridge infrastructure after the heavy flood in 2021, ensuring compliance with industry

Read more
  • December 28, 2024
  • bieng

Murray Irrigation Bridge Inspection Project, NSW May 2024 to September 2024

About the project: The Murray Irrigation Bridge Inspection Project was a significant infrastructure assessment initiative commissioned by Murray Irrigation. Bridge Inspection Engineers carried out all the 350 Level 2 inspections as per TfNSW Road Inspection Manual while BG&E carried out all the level 3 investigations. The project involved conducting Level

Read more
  • December 6, 2024
  • bieng

Bridges & Culvert Level 2 Inspection, Macedon Ranges Shire Council, Victoria

We performed comprehensive level 1 and level 2 inspections on a total of 80 bridges and culverts across the regions of Macedon, Kyneton, Romsey, and Gisborne. These inspections involved a thorough assessment of the structural integrity and safety of the infrastructure, identifying any potential issues or areas requiring maintenance or

Read more
  • October 23, 2021
  • bieng

Inspection Projects

Inspection Projects At Bridge Inspection Engineers (BIE): We specialize in providing thorough and accurate assessments of structures to ensure their safety and integrity. With a team of experienced and highly trained engineers, we utilize the latest technology and techniques to conduct comprehensive inspections that meet all regulatory standards. Our commitment

Read more

Recent Posts

    Recent Comments

    No comments to show.

    Category

    • No categories

    Contact us

    • 16 Martine court, Hoppers Crossing 3029 VIC
    • info@bieng.com.au

    Our services

    • Bridge Inspection
    • Other Structure Inspection
    • Bridge Asset Management

    Useful links

    • About Us
    • Contact Us

    © 2024 Bridge Inspection Engineers

    • Design & Maintained by KENU Technolo
    dustra
    Get a quote